Central Railway Station: through the Lens
Highlighting the transformation of Central Railway Station from its opening in 1855 to 1921 when the clocktower was completed
The first ‘Sydney’ station, 1855-1874
The first railway line in Sydney opened in 1855 and operated between Sydney and Parramatta. The Sydney terminal station was built in September 1855 on traditional Gadigal land of the Eora Nation. The site was also known as the ‘Cleveland Paddock’, situated between Devonshire and Cleveland streets. The station was commonly referred to as Redfern Station as it was located close to Redfern. The station has been described as a “temporary tin shed” [1], due to the fact it was a single 30m long wooden platform in a corrugated iron shed [2]. In 1856 additional railway sheds and yards were added to the site but by the early 1870s the station was unable to meet the demands of the rapidly growing Sydney railway network.
The second ‘Sydney’ station, 1874-1906
The second terminal station was designed by the Railways Chief Engineer John Whitton (who designed the Zig Zag railway in the Blue Mountains). It opened in 1874 on the same site as the first station and continued to be known as Redfern. Whitton described the station as a through station to allow for the future expansion of the railways[3]. While the brick and stone building was impressive when first built, by the 1880s platforms (up to 13 in total) had spread to the forecourt area[4]. In 1899 there were 25 million passenger visits to the terminal station and the site was simply too restrictive and congested for any more development[5].
The third ‘Sydney’ station – Central Railway Station
The plan to shift the Sydney terminal station to the north side of Devonshire Street was proposed by the Minister for Public Works, E.W. O’Sullivan. Government Architect W.L. Vernon designed a 15 platform steel-framed and concrete station [6]. Parliament approved the Act for its construction on 11 December 1900 at an estimated cost of £561, 000[7]. The design for the station included a large arched roof to cover the main concourse area, with covered platforms and pedestrian access through subways between George St West and Strawberry Hills. Railway Square became a major tram interchange point. The sandstone used in the construction came from the Pyrmont Quarry, the decorative marble from Borenore, near Orange[8] and the ticket office was made of Tasmanian blackwood. The clocktower (construction began on this in 1915) stands 85.6m above mean sea level and includes four clock faces that are 4.77m in diameter[9].
Before construction could begin the site had to be cleared of the rail sheds and yards. Property resumption included the Benevolent Asylum, Devonshire Street Cemetery, Christ Church Parsonage, Police Barracks, Sydney Female Refuge, Convent of the Good Samaritan and the South Sydney Morgue[10]. At the Devonshire Street Cemetery site, £27, 890 was spent on relocating the remains and headstones to a new cemetery site at Botany and around Sydney[11].
The new Central Railway Station opened in 1906 after several years of construction. It is also referred to as the third Sydney Station. Most of the construction was completed by 1906 and the site was officially opened on 4 August 1906.
Sydney/Central Station Milestones
1855 (Sep) First Sydney Station opened south of Devonshire St
1871 Construction on second Sydney station begins
1874 Second Sydney station opened
1890 Royal Commission appointed to inquire into proposed extension of the railway into the City
1896-97 Royal Commission on City Railway Extension
1900 (11 Dec) City Railway Extension (Devonshire-street) Act, 1900
1902 (30 April) Foundation stone for Central Station laid by Minister O’Sullivan in heavy rain
1903 (26 Sep) Second foundation stone laid at base of clock tower by Premier John See
1906 (4 Aug) Premier Carruthers turned gold key in booking office and officially opened Central Station; first official train left from platform 12 on a special run to Parramatta
1906 (5 Aug) First train service, the Western Mail train, ran through Central at 5.50am
1909 Royal Commissioners for the Improvement of the City of Sydney and its Suburbs recommended construction of electric rail
1914 Platforms 16-19 added
1915 Work begins on two additional floors to house offices and clock tower; not completed until 1921 due to World War I restrictions
1921 (3 Mar) 75m tall sandstone clocktower came into use at 10.22am
Related
Footnotes*
[1] Lee, p.27
[2] City rail
[3] City rail
[4] Lee, p.98
[5] City rail
[6] City rail
[7] Gunn, p.238
[8] City rail
[9] Preston, p.59
[10] Ibid.
[11] Idib.
* URL citations correct at date of publication.
References
Collection Activity 154 Railway and Tramway construction
NRS 17514/1/2 [47] The Railways of New South Wales 1855-1955
Central Station – in-depth history (accessed February 2013) at
John Gunn, Along Parallel Lines: a history of the railways of New South Wales 1850-1986, Melbourne University Press, 1989
Robert Lee, The Greatest Public Work: The New South Wales Railways – 1848 to 1889, Hale & Iremonger, 1988
R.G. Preston, 125 Years of the Sydney to Parramatta Railway, NSW Rail Transport Museum, 1980
Research by
Suzanne Upton, Former Archivist Public Access
Published on
More stories
Browse allThe Alexander Mackintosh Archive: revealing records of a master builder
Forgotten for decades, the archive of building contractor Alexander Mackintosh was rediscovered in a roof space in the 1990s. It includes more than 270 architectural drawings and reveals information about the work of many of Sydney’s leading architects of the early 20th century
The architectural pattern books of Elizabeth Macquarie
The architectural achievements of Governor Macquarie’s era are usually attributed to Macquarie’s architect Francis Greenway. Yet evidence collected during an inquiry into the state of the colony of NSW in the early 1820s includes references to the involvement of the governor’s wife, Elizabeth Macquarie, in matters architectural
Wallpaper
Beyond the wallpaper: the life and work of Phyllis and John Murphy
A significant donation of more than 3,000 wallpaper samples to the Caroline Simpson Library reflects just one facet of the remarkable careers of Phyllis and John Murphy, partners in life, architecture and heritage conservation
The Mint project: Sydney’s adaptive reuse triumph
Sydney’s urban landscape is a testament to both the city’s rich history and examples of forward-thinking vision. Among the most compelling examples of this fusion of past and future is the revitalisation of the Mint complex